FAQs
More FAQs- Do I have to sign a long-term contract?
- Are there instructions to follow after my hard-surface floors are cleaned?
- How long will it take to have my floors coated with acrylic?
A contract is not a requirement. ServiceMaster of Victoria will develop a detailed proposal and task schedule that will both meet your needs and budget. At any time, you can make adjustments to your cleaning requirements, and your representative will then make changes as needed and advise of any pricing revisions. You may also cancel your commercial cleaning service with 30 days written notice
Before you walk on your floors, it’s best to allow a minimum drying time of at least 1 hour. We recommend allowing 24 hours before walking on it with heavy traffic. Be cautious and protect floors from getting wet for 24 hours after application of either finish as it is not thoroughly cured yet. You can return furniture to your floors (with suggested use of felt pads) after 12 hours and return rugs to floors after 12 hours.
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.